banner banner

PROJECTS UNDER EXECUTION (IN-HAND)

Sr. No. Works at Lahore

1.
2.
3.


Operation of Track Workshop at Raiwind
Operation of Track Machine Shop and operation of Track Machines on Divisions
Construction of Regional Blood Center at Faisalabad

Sr. No. Works at Multan

1.


Construction of Academic Block at Air University

Sr. No. Works at Rawalpindi

1.


Construction of Regional Blood Center at Islamabad

Sr. No. Works at Sukkur

1.
2.
3.
4.


Construction of RCC Road and check Post (Security Tower) at Main Campus (IBA University)
Construction of Gymnasium and Swimming Pool at Cadet College Ghotki
Construction of Tenis Court & Jogging Track, Cadet College, Khairpur
Supply of 500,000 cft mechanically crushed Stone Ballast at Peerak Station

Sr. No. Works at Karachi

1.
2.


Supply of Ballast at KPT-KC Section at Nooriabad (840,000 cft)
Construction of Box Culvert at South Asian Pacific Terminal (SAPT)

Home | Sitemap | Feedback | Downloads | Jobs

© Copyright 2014-2018 RAILCOP - All Rights Reserved