Projects of Ballast Supply to Pakistan Railways

 

=> Operation of Mechanized Quarries at Shaheenabad
=> Supply of Ballast on MPS Conversion project
=> Supply of Ballast from D.G. Khan Quarry
=> Ballast Project Shaheenabad-II
=> Ballast Supply at Bandhi
=> Ballast Supply at Peerak
=> Ballast supply from Jangshahi Quarry No. I & II
=> Ballast Supply at Kashmore
=> Ballast Project Shershah for Track Renewal Project
=> Supplying, Stacking and loading into Railway Wagons 2" 50mm mechanically crushed stone ballast 5 lacks cft ar Dour Station.
=> Supplying, Stacking and loading into Railway Wagons 2" 50mm mechanically crushed stone ballast 8 lacks cft at Padidan Station.
=> Supplying, Stacking and loading into Railway Wagons 2" 50mm mechanically crushed stone ballast 8 lacks cft at Walhar Station.
=> Supplying, Stacking and loading into Railway Wagons 2" 50mm mechanically crushed stone ballast 8 lacks cft at Dharki Station.
=> Supply of mechanically crushed 2" (50MM) nominal size stone ballast 8 lacs cft at Liaqatpur-I Railway Station.
=> Supplying, stacking and loading of 2" size mechanically crushed stone from Shaheenabad Quarry (2nd term)
=> Ballast Supply Line No.2-C at Marshaling Yard Pipri (0.5 million cft)
=> Ballast Supply Line No.121 at Marshaling Yard Pipri (0.5 million cft)
=> Ballast Supply for dualization of Bin Qasim-Port Qasim Line at Marshaling Yard Pipri (1.0 million cft)
=> Supply, stacking and loading into Railway Wagons 2" (50mm) mechnaical crushed stone ballast 5 lac cft at Dour Station
=> Supply of Ballast at Walhar-II Station (Mirpur Mathelo) (5 lacks cft)
=> Supply of Ballast at Sadiqabad (5 lacks cft)
=> Supply of Ballast at Khanpur (5 lacks cft)
=> Supply of Ballast at Peerak-II (5 lacks cft)



 
       
       
 
© Copyright 2014 RAILCOP - All Rights Reserved